Search
You can find the results of your search below.
Fulltext results:
- Plastic Shredder
- aterial costs were reduced, although painting was required to prevent corrosion. * blades were cut from B... ccording to advice from the suppliers. A pause is required after about 2 hr continuous use to allow things t... given the cost of manufacture, and wide skill set required for the build, members of the public wanting to h
- Sheet Former
- nt sticking. Temperature control is an obvious improvement to be considered. Ventilation will be required .
- Injection Moulder
- t. A rigid metal container for the moulds will be required to prevent fracturing, and this may be made to or