===== Pre-Production ===== These materials are per participant if not specified otherwise: * 1 x A3 corrugated cardboard sheet, 3mm * 2 x A3 corrugated cardboard sheets, 6mm * 1 x A3 coated acrylic 3mm (for picks, plug support chamber support 10 - per sheet) * 1 x A3 Coated acrylic, 6mm (for tension wrenches - 30 per sheet ) * 1 x Postage tube, 51mm (O/D:60mm) * 3 x 45mm metal pipe (I/D: 7-9mm O/D: 10mm) * 3 x Retractable Ballpoint pen (for spring) * 3 x Skewers (3mm diameter) * 3 x 30mm Dowel (Diameter: 6mm) * 3 x 25mm Dowel (Diameter: 6mm) * 3 x O-ring (I/D: 4.1mm O/D: 7.3mm), Nitrile rubber * 2 x strong mini magnets * Electrical tape * 2 x Rubber bands (fit around the hull) * Sandpaper (not too rough) ==== Notes - 28 Nov 2016 ==== Andrei and I looked out files for cutting and a hard copy protype of of the latest Lock as per Phil's instructions {{ :workshops:2016_deliveries:lock:20161106_lock_prep_woodford_pg_1_.pdf |}} We built the prototype from these parts and have got it working fairly well. There are a couple of design files that need to be found or drawn up for: * the back plate of the hull * front Plate of the Hull (possibly with some branding- if we have time) * front cover for the plug (to hide the tape) Here's the finished product without the Plug front and hull front {{:mobileupload:mick:20161128:20161128_172011.jpg?direct&300|}} We'll cut one of these from scratch and assemble as a test before prepping boxes Here's the exploded view of all parts without the three parts mentioned above {{:mobileupload:mick:20161129:20161129_113034.jpg?direct&300|}} {{:mobileupload:mick:20161129:20161129_112956.jpg?direct&300|}} {{:mobileupload:mick:20161129:20161129_113020.jpg?direct&300|}} ==== Notes - 01 Dec 2106 ==== Found that the 3mm cardboard (which is actually 3.5mm) is too thick to cut plug parts have moved to 2.7mm pallet pad ====Packing Instructions for Woodford==== The Packing process has been designed to ensure the kits are presentable, parts are easy to find and in a logical order (to assist in delivery in the dark at Woodford) and can be easily check that all parts are in each kit {{:workshops:2016_deliveries:lock:complete.jpg?direct&300|}} ===List of parts=== == Hull == 6x standard hull plates 1x Front cover plate 1x back cover plate 1x Hasp plate {{:workshops:2016_deliveries:lock:cardboard_parts.jpg?direct&200|}} == Plug/ barrel== 7 x Key hole plates (#17 spare, 16, 12, 11, 7 & 6) 6x plug support plates (#15, 14, 13, 10, 5 & 4) 2x Plugsupport/magnet plates (#9 & 8) 1x Back plug plate 1x front plugg plate (6mm double ply card) 1x plug cylinder ( postage tube) 2x desiccant satchel {{:workshops:2016_deliveries:lock:cardboard_packed.jpg?direct&200|}} ==Timber parts== 3x skewers cut in half (6x 1/2 skewers) 3x Top Pin (Dowel 30 mm) 3x Key Pins (Dowel 24mm with seat) 3x Orings {{:workshops:2016_deliveries:lock:bag_parts.jpg?direct&200|}} == metal Parts == 2x magnets 3x chamber 3x camber spring {{:workshops:2016_deliveries:lock:metalparts.jpg?direct&200|}} ==Plastic parts== 1x Chamber support (small holes) 2x Chambers support (regular holes) 1x Lock Pick 1x Tension Bar (6mm) 18x Plug supports 2x plug support spare {{:workshops:2016_deliveries:lock:plastic_parts.jpg?direct&200|}} ==== Files ==== This is where you put files for laser cutting etc.. {{ :workshops:2016_deliveries:lock:20161128_lock_wf_2016-17.zip |}} Barrel/ Plug laid out on 280x730 for 2.5mm pallet pad {{ :workshops:2016_deliveries:lock:backup_of_barrelmb01122016.cdr |}} {{ :workshops:2016_deliveries:lock:acrylic_parts_x_8_on_template.cdr}} |{{ :workshops:2016_deliveries:lock:frontplatehull.cdr |}} {{ :workshops:2016_deliveries:lock:hull_v.101.cdr |}} {{ :workshops:2016_deliveries:lock:lock_barrel-1.cdr |}} {{ :workshops:2016_deliveries:lock:acrylic_parts_x_8_on_template_v1.cdr |}}